## 1- 14/03/24: Emptying the lowerator on L25-TL22
|
|||
|
|
|||
|
Can you provide a quote for Henkel to implement the following modification of the program for L25 Henkel to allow the following task. I have discussed the scope as mentioned below and have suggested the change of program will be an additional cost to implement.
|
|||
|
|
|||
|
![[Pasted image 20240322121614.png]]
|
|||
|
|
|||
|
* The motors M63 and M62 will be deactivated via a switch on the HMI.
|
|||
|
* The chosen logic will replicate that which has been applied in the new line TLO23.
|
|||
|
* This switch is intended to be activated during the final 5 minutes of production, allowing the lowerator to empty. Once production resumes, the operator can disable this function through the HMI.
|
|||
|
* We will create an warning on the HMI that signals when this function is engaged, so incoming shifts can understand why the preceding lowerator motors are on hold.
|
|||
|
* Moreover, this function will automatically reset following a complete line stop and restart, which are controlled by the physical stop/start buttons for the top line.
|
|||
|
|
|||
|
* ==Time needed to do this work:==
|
|||
|
* 4 hs on Italia
|
|||
|
* 4 hs on site for test
|
|||
|
|
|||
|
## 2- 21/03/24: Rondelle - New formats commissioning status ALPLA Bowling Green – symphony –
|
|||
|
|
|||
|
#### ==Risposta da Lenin:==
|
|||
|
|
|||
|
1. Su quali tratti di linea hanno montato le rondelle?
|
|||
|
- Le rondelle sono montate sui tratti che utilizzano attuatori elettrici delle linee TLO22, TLO24 e TLO26.
|
|||
|
2. Qual è il range di regolazione attuale sui tratti di linea modificati?
|
|||
|
* Il range di regolazione minimo attuale è di 68 mm.
|
|||
|
1. Qual è il range di regolazione attuale sui tratti di linea NON modificati?
|
|||
|
* 72 mm
|
|||
|
1. Come hanno terminato i test? Perché ALPLA mi ha detto che per loro i test sono stati superati nonostante le 2000 bottiglie. Nel 2025 riprenderanno la produzione e nel caso potremmo fare delle modifiche nei prossimi mesi sulle linee interessate.
|
|||
|
* Abbiamo riscontrato problemi solo nella linea TLO26 con le bottiglie LF02 e LF03, ma non per l'aggiustamento delle guide. I problemi si presentano all'ingresso dei BT (bottiglie cadute).
|
|||
|
|
|||
|
|
|||
|
## 3- 22/03/24: Video of the last jobs done working
|
|||
|
|
|||
|
* Ask Alfredo to do some vídeos:
|
|||
|
|
|||
|
Siccome la linea è finita e collaudata quando Alfredo ha tempo può fare foto e video alta definizione di:
|
|||
|
|
|||
|
* 9.3674 Tutta la linea 20 lato HENKEL dal muro ALPLA fino ad ingresso filler
|
|||
|
* [Video March 2024 TL23 L20](https://1drv.ms/f/s!Ap46vAtZDpwSi4QwKguC35Iw72mEtg?e=xKSpvS)
|
|||
|
* 9.3744 Inserimento PE linea 40
|
|||
|
* 9.3756 Inserimento PE linea 25
|
|||
|
|
|||
|
Non occorre che le linee siano in funzione durante il video. E’ solo per salvare sul nostro server come abbiamo lasciato la linea al cliente.
|
|||
|
|
|||
|
- ==Already asked - waiting for the other videos==
|
|||
|
|
|||
|
## 4- 01/03/24: 9.3806 - HENKEL - TL21-L23.L24 - Q5 - Inserimento Labeler PE
|
|||
|
|
|||
|
- Excel with communication map for Malisko.
|
|||
|
- Description of the logic.
|
|||
|
- Software for the Q5 modification – 90 % done
|
|||
|
- Collaudo se finirá martedì 03-04 - Chingioli girano gia. Testato Minimotor.
|
|||
|
- ==Da aggiungere 3 fotocélule== per il conteggio - standistiche
|
|||
|
- ==Aspetando nuovo schema/modifica con le modifiche per i sensori termici di motori Lenze M157-M158==
|
|||
|
- Alex mi ha detto che se usarano E47.5 e E47.6
|
|||
|
- ==Software finito==
|
|||
|
|
|||
|
## 5- 14/03/24: 9.3976 - Guides EMD Interlock
|
|||
|
|
|||
|
* Software fato e testato a casa.
|
|||
|
* ==Bisogno caricare il software su tutti PLC a Henkel.==
|
|||
|
* Supervisore
|
|||
|
* Q1: TL21, TL21, TL23, TL25, TL26, TL27
|
|||
|
* ==12== PLC Q2-Q4 e HMI
|
|||
|
* ==Aspettare il cliente habilite a caricare questi software==
|
|||
|
|
|||
|
### 6- 21/03/24 : TL23 Q2 - Q3 Motors with Fault F7807 - Motors 47, 49, 50 e 51, 53 e 57
|
|||
|
|
|||
|
Inverts type: 6SL3210-1KE13-2UF2
|
|||
|
Motors: 0,75Kw
|
|||
|
|
|||
|
##### Photos:
|
|||
|
|
|||
|
![[Imagen de WhatsApp 2024-03-21 a las 16.24.53_c11515ab.jpg|200]]
|
|||
|
|
|||
|
![[Pasted image 20240325145819.png]]
|
|||
|
|
|||
|
![[Pasted image 20240325100238.png]]
|
|||
|
|
|||
|
##### History:
|
|||
|
***
|
|||
|
* 21/02/24 : Alfredo slow down the max speed and ask for the electrician to test the connections and cables.
|
|||
|
* 22/03/24 : Alfredo tested changing the time on the p347 from 0,42 to 1s and he do again the tunning.
|
|||
|
* 25/03/24 : Alfredo mi ha detto che durante il fine settimana non ha girato questa linea quindi non abbiamo aggiornamenti.
|
|||
|
* 27/03/24 : Alfredo mi ha detto che dopo la modifica non ha avuto piu fault.
|
|||
|
* 18/04/24 : Problema se e presentato nuovamente.
|
|||
|
* Chiesto a Siemens se ha una idea de che si puo fare
|
|||
|
* Chiesto a Alfredo de cambiare il p1901 per disabilitare la allarma
|
|||
|
* Con Lenin stano copiando i parametri dal Q1
|
|||
|
* 19/04/24 : Lenin ha trovato che quelli motori non erano in cascata
|
|||
|
* 15/05/24 : ==Sembra risolto dopo la modifica software.==
|
|||
|
|
|||
|
### 7- 9.3968 HENKEL motor guides with PLC attached to Q2 TL26
|
|||
|
|
|||
|
* Henkel ask for Remote managment when Q2 change format:
|
|||
|
* The Remote managment from Q2 we need:
|
|||
|
* Create a page on the HMI and do communication (new GET/PUT) between the Q2 and the new PLC - ==10 ore a casa==.
|
|||
|
* Test the remote magnament - 10 ore in fabrica
|
|||
|
* OPC sul Supervisore:
|
|||
|
* Fare come funzionano tutte gli Q1 non e racomendabile. => modificare Q1 e Supervisore e rischiare a fermare il supervisore per una giornata.
|
|||
|
* Nel caso chi sia solo 1 bit di Guides OK o In Fault il lavoro e solo di 4 ore sul Q2.
|
|||
|
* Questo bit dopo se gira in automatico verso il Supervisore e il OPC lo publica. La idea e usare un bit spare. Come questo X12 che arriva dal Q2 e finisce nel OPC del Supervisore:
|
|||
|
* ![[Pasted image 20240419093031.png|475]]
|
|||
|
* ==Questo non supone modifiche su il Q1 e nel Supervisore== Solo nel Q2. ==Laboro da 4 ore==
|
|||
|
|
|||
|
#### 8- 05/04-24 - Per la 9.3944 ti chiedo di aggiornare il protocollo scambio segnali TLO23-L20 da mandare per approvazione ad HENKEL.
|
|||
|
|
|||
|
* ==Da verificare==
|
|||
|
|
|||
|
#### 9- 05/04/24 - Per la 9.3944 ti chiedo di aggiornare il protocollo scambio segnali 9.3756 TLO22-L25 - 9.3744 TLO27-L40
|
|||
|
|
|||
|
- Senza fretta, ti chiedo, in base alle vostre priorità, ti chiedo di aggiornare il protocollo e file excel così da rispecchiare in cantiere quanto installato per le seguenti:
|
|||
|
- 9.3744 TLO27-L40
|
|||
|
- 9.3756 TLO22-L25 (non trovo file excel)
|
|||
|
- Secondo me puoi chiedere a Wilbert, adesso lui è ad Amcor, Dallas.
|
|||
|
- Te lo chiedo perchè HENKEL vuole installare queste etichettatrici PE su tutte le linee a Bowling Green e anche su altri cantieri quindi è necessario chiarire esattamente funzionamento delle varie casistiche così da poterlo replicare in altri progetti senza doverlo ridiscutere con loro.
|
|||
|
- ==Da verificare==
|
|||
|
|
|||
|
#### 10- 09-04-2024 - Alpla BOW2 - Changeover to be run permissive - Comessa creata **9.4017**
|
|||
|
|
|||
|
```
|
|||
|
Dal cliente:
|
|||
|
-------------
|
|||
|
ope all is well.
|
|||
|
We’d like to make a change based on an RCA we recently did.
|
|||
|
I’d like to have our lines not be able to be put into auto whilst the HMI say’s changeover in progress.
|
|||
|
This would prevent the team from putting the line into run before all of the different equipment has loaded the new format.
|
|||
|
I already talked this through with Lenin, was hoping he could do this change whilst he is here this week.
|
|||
|
Please let me know if we can move forward with this.
|
|||
|
```
|
|||
|
|
|||
|
* Creato una logica di como se puo fare
|
|||
|
* Richiesto a Lenin una opinione
|
|||
|
* Lenin mi ha risposto che lui la imaginaba ugualmente.
|
|||
|
|
|||
|
|
|||
|
#### 11- Verificare che tutte le modifiche aportatti sono su il OPC
|
|||
|
* Su la modifica 9.3806 Q5
|
|||
|
* Su la linea nuova TL23 9.3674
|
|||
|
* Da Max: [mailbox-message://nobody@Local%20Folders/Trabajo/VetroMecanicca#219](mailbox:///C:/Users/migue/AppData/Roaming/Thunderbird/Profiles/7m3jp6c9.default-release/Mail/Local%20Folders/Trabajo.sbd/VetroMecanicca?number=219)
|
|||
|
* 9.3062 switch managed supervisione
|
|||
|
- 9.3060-3067 switch managed tutti QE 1 lato ALPLA (non so se ci sia un bit che comunichi come gli inverter se ci sono problemi)
|
|||
|
- 9.3577 merger TLO28 aggiunto un motoriduttore traino catena
|
|||
|
- 9.3566+3806 estensione L23/24 aggiunto scambio pneumatico in quota, scambio a terra e diversi motoriduttori
|
|||
|
- 9.3744 inserimento etichettatrice linea 40
|
|||
|
- 9.3756 inserimento etichettatrice linea 25
|
|||
|
- 9.3674+3944 estensione L20
|
|||
|
- 9.3968 estensione L42
|
|||
|
|
|||
|
#### 12- [[9.4006 - Feedback flow - Notes for technician on site TL22 - Q3-Q1]]
|
|||
|
|
|||
|
* Brandom Miller da Henkel ha richiesto aggiungere questo feedback:
|
|||
|
|
|||
|
| | |
|
|||
|
| ---------------------- | -------------------------------------------------------------- |
|
|||
|
| Data_From_EbConvey[15] | Flow Selection - 1=Old Labeler, 2=New PE Labeler, 0=Flow error |
|
|||
|
* Questo lo debe aprobare Max comercialmente
|
|||
|
* 02/05/24 : approvato da fare
|
|||
|
* 10/05/24 : Lenin lo ha caricato
|
|||
|
|
|||
|
|
|||
|
#### 13 - [[9.4017 - Changeover to be run permissive]]
|
|||
|
* 09-04-2024 - ALPLA ha chiesto questa modifica
|
|||
|
* E stata preparata e concordata con Lenin
|
|||
|
* ==27-05-2024 - Se implementara insieme a altre modifiche gia preparate==
|
|||
|
|
|||
|
#### 14 - 9.3944 Orientatore
|
|||
|