1- 14/03/24: Emptying the lowerator on L25-TL22

Can you provide a quote for Henkel to implement the following modification of the program for L25 Henkel to allow the following task. I have discussed the scope as mentioned below and have suggested the change of program will be an additional cost to implement.

!Pasted image 20240322121614.png

  • The motors M63 and M62 will be deactivated via a switch on the HMI.

  • The chosen logic will replicate that which has been applied in the new line TLO23.

  • This switch is intended to be activated during the final 5 minutes of production, allowing the lowerator to empty. Once production resumes, the operator can disable this function through the HMI.

  • We will create an warning on the HMI that signals when this function is engaged, so incoming shifts can understand why the preceding lowerator motors are on hold.

  • Moreover, this function will automatically reset following a complete line stop and restart, which are controlled by the physical stop/start buttons for the top line.

  • ==Time needed to do this work:==

    • 4 hs on Italia
    • 4 hs on site for test

2- 21/03/24: Rondelle - New formats commissioning status ALPLA Bowling Green symphony

==Risposta da Lenin:==

  1. Su quali tratti di linea hanno montato le rondelle?
    • Le rondelle sono montate sui tratti che utilizzano attuatori elettrici delle linee TLO22, TLO24 e TLO26.
  2. Qual è il range di regolazione attuale sui tratti di linea modificati?
    • Il range di regolazione minimo attuale è di 68 mm.
  3. Qual è il range di regolazione attuale sui tratti di linea NON modificati?
    • 72 mm
  4. Come hanno terminato i test? Perché ALPLA mi ha detto che per loro i test sono stati superati nonostante le 2000 bottiglie. Nel 2025 riprenderanno la produzione e nel caso potremmo fare delle modifiche nei prossimi mesi sulle linee interessate.
    • Abbiamo riscontrato problemi solo nella linea TLO26 con le bottiglie LF02 e LF03, ma non per l'aggiustamento delle guide. I problemi si presentano all'ingresso dei BT (bottiglie cadute).

3- 22/03/24: Video of the last jobs done working

  • Ask Alfredo to do some vídeos:

Siccome la linea è finita e collaudata quando Alfredo ha tempo può fare foto e video alta definizione di:

  • 9.3674 Tutta la linea 20 lato HENKEL dal muro ALPLA fino ad ingresso filler
  • 9.3744 Inserimento PE linea 40
  • 9.3756 Inserimento PE linea 25

Non occorre che le linee siano in funzione durante il video. E solo per salvare sul nostro server come abbiamo lasciato la linea al cliente.

  • ==Already asked - waiting for the other videos==

4- 01/03/24: 9.3806 - HENKEL - TL21-L23.L24 - Q5 - Inserimento Labeler PE

  • Excel with communication map for Malisko.
  • Description of the logic.
  • Software for the Q5 modification 90 % done
  • Collaudo se finirá martedì 03-04 - Chingioli girano gia. Testato Minimotor.
  • ==Da aggiungere 3 fotocélule== per il conteggio - standistiche
  • ==Aspetando nuovo schema/modifica con le modifiche per i sensori termici di motori Lenze M157-M158==
    • Alex mi ha detto che se usarano E47.5 e E47.6
  • ==Software finito==

5- 14/03/24: 9.3976 - Guides EMD Interlock

  • Software fato e testato a casa.
  • ==Bisogno caricare il software su tutti PLC a Henkel.==
    • Supervisore
    • Q1: TL21, TL21, TL23, TL25, TL26, TL27
    • ==12== PLC Q2-Q4 e HMI
  • ==Aspettare il cliente habilite a caricare questi software==

6- 21/03/24 : TL23 Q2 - Q3 Motors with Fault F7807 - Motors 47, 49, 50 e 51, 53 e 57

Inverts type: 6SL3210-1KE13-2UF2 Motors: 0,75Kw

Photos:

!Imagen de WhatsApp 2024-03-21 a las 16.24.53_c11515ab.jpg

!Pasted image 20240325145819.png

!Pasted image 20240325100238.png

History:

  • 21/02/24 : Alfredo slow down the max speed and ask for the electrician to test the connections and cables.
  • 22/03/24 : Alfredo tested changing the time on the p347 from 0,42 to 1s and he do again the tunning.
  • 25/03/24 : Alfredo mi ha detto che durante il fine settimana non ha girato questa linea quindi non abbiamo aggiornamenti.
  • 27/03/24 : Alfredo mi ha detto che dopo la modifica non ha avuto piu fault.
  • 18/04/24 : Problema se e presentato nuovamente.
    • Chiesto a Siemens se ha una idea de che si puo fare
    • Chiesto a Alfredo de cambiare il p1901 per disabilitare la allarma
    • Con Lenin stano copiando i parametri dal Q1
  • 19/04/24 : Lenin ha trovato che quelli motori non erano in cascata
  • 15/05/24 : ==Sembra risolto dopo la modifica software.==

7- 9.3968 HENKEL motor guides with PLC attached to Q2 TL26

  • Henkel ask for Remote managment when Q2 change format:
  • The Remote managment from Q2 we need:
    • Create a page on the HMI and do communication (new GET/PUT) between the Q2 and the new PLC - ==10 ore a casa==.
    • Test the remote magnament - 10 ore in fabrica
  • OPC sul Supervisore:
    • Fare come funzionano tutte gli Q1 non e racomendabile. => modificare Q1 e Supervisore e rischiare a fermare il supervisore per una giornata.
    • Nel caso chi sia solo 1 bit di Guides OK o In Fault il lavoro e solo di 4 ore sul Q2.
      • Questo bit dopo se gira in automatico verso il Supervisore e il OPC lo publica. La idea e usare un bit spare. Come questo X12 che arriva dal Q2 e finisce nel OPC del Supervisore:
      • !Pasted image 20240419093031.png
      • ==Questo non supone modifiche su il Q1 e nel Supervisore== Solo nel Q2. ==Laboro da 4 ore==

8- 05/04-24 - Per la 9.3944 ti chiedo di aggiornare il protocollo scambio segnali TLO23-L20 da mandare per approvazione ad HENKEL.

  • ==Da verificare==

9- 05/04/24 - Per la 9.3944 ti chiedo di aggiornare il protocollo scambio segnali 9.3756 TLO22-L25 - 9.3744 TLO27-L40

  • Senza fretta, ti chiedo, in base alle vostre priorità, ti chiedo di aggiornare il protocollo e file excel così da rispecchiare in cantiere quanto installato per le seguenti:
  • 9.3744 TLO27-L40
  • 9.3756 TLO22-L25 (non trovo file excel)
  • Secondo me puoi chiedere a Wilbert, adesso lui è ad Amcor, Dallas.
  • Te lo chiedo perchè HENKEL vuole installare queste etichettatrici PE su tutte le linee a Bowling Green e anche su altri cantieri quindi è necessario chiarire esattamente funzionamento delle varie casistiche così da poterlo replicare in altri progetti senza doverlo ridiscutere con loro.
  • ==Da verificare==

10- 09-04-2024 - Alpla BOW2 - Changeover to be run permissive - Comessa creata 9.4017

Dal cliente:
-------------
ope all is well.
Wed like to make a change based on an RCA we recently did.
Id like to have our lines not be able to be put into auto whilst the HMI says changeover in progress.
This would prevent the team from putting the line into run before all of the different equipment has loaded the new format.
I already talked this through with Lenin, was hoping he could do this change whilst he is here this week.
Please let me know if we can move forward with this.
  • Creato una logica di como se puo fare
  • Richiesto a Lenin una opinione
    • Lenin mi ha risposto che lui la imaginaba ugualmente.

11- Verificare che tutte le modifiche aportatti sono su il OPC

  • Su la modifica 9.3806 Q5
  • Su la linea nuova TL23 9.3674
  • Da Max: mailbox-message://nobody@Local%20Folders/Trabajo/VetroMecanicca#219
    • 9.3062 switch managed supervisione
    • 9.3060-3067 switch managed tutti QE 1 lato ALPLA (non so se ci sia un bit che comunichi come gli inverter se ci sono problemi)
    • 9.3577 merger TLO28 aggiunto un motoriduttore traino catena
    • 9.3566+3806 estensione L23/24 aggiunto scambio pneumatico in quota, scambio a terra e diversi motoriduttori
    • 9.3744 inserimento etichettatrice linea 40
    • 9.3756 inserimento etichettatrice linea 25
    • 9.3674+3944 estensione L20
    • 9.3968 estensione L42

12- 9.4006 - Feedback flow - Notes for technician on site TL22 - Q3-Q1

  • Brandom Miller da Henkel ha richiesto aggiungere questo feedback:
Data_From_EbConvey[15] Flow Selection - 1=Old Labeler, 2=New PE Labeler, 0=Flow error
  • Questo lo debe aprobare Max comercialmente
  • 02/05/24 : approvato da fare
  • 10/05/24 : Lenin lo ha caricato

13 - 9.4017 - Changeover to be run permissive

  • 09-04-2024 - ALPLA ha chiesto questa modifica
  • E stata preparata e concordata con Lenin
  • ==27-05-2024 - Se implementara insieme a altre modifiche gia preparate==

14 - 9.3944 Orientatore

  • Previsto per : 24/06/2024