61 lines
3.0 KiB
Markdown
61 lines
3.0 KiB
Markdown
|
## Lines Transport Programming Information
|
||
|
|
||
|
### Table: Line Specifications
|
||
|
***
|
||
|
|
||
|
| Line Name | Product | Max Speed | Product Spacing | Conveyor Speed | Coder Model | Mark & Read Solution |
|
||
|
|-----------|---------|-----------|-----------------|----------------|-------------|----------------------|
|
||
|
| Dressing | Bottles | 50 bpm | 200 mm | 10 m/min | 9750 | OCR |
|
||
|
| FS Jar | Bottles | 30 bpm | 260 mm | 8 m/min | 9750 | OCR |
|
||
|
| Copack | Bottles | 110 bpm | 200 mm | 22 m/min | 9750 | OCR |
|
||
|
| Copack | Cases | 10 cpm | Not specified | Not specified | 5800 | OCR |
|
||
|
| FS Jar | Cases | 5 cpm | Not specified | Not specified | 5800 | OCR |
|
||
|
|
||
|
### Additional Notes for Programming:
|
||
|
|
||
|
1. **Signal Communication:**
|
||
|
- For the Copack Line, there are specific signals between the Labeler and Conveyor:
|
||
|
- From Labeler to Vetro: 81KA3 (relay) for downstream accumulation alarm signal
|
||
|
- From Vetro to Labeler: 80KA2 for the labeler infeed gate close signal
|
||
|
|
||
|
2. **Line Control:**
|
||
|
- Blow molder:
|
||
|
- Requires a DO for downstream full detection to inhibit bottle discharge
|
||
|
- Requires a DI for restarting once downstream conveyor full condition is gone
|
||
|
- Filler: No signals required for communication
|
||
|
- Labeler (Dressing line): Consider signal for gate control of the accumulation table
|
||
|
- Sealer: No signals required for communication with Cap Sealer for dressing
|
||
|
|
||
|
3. **Case Handling:**
|
||
|
- Case supply is fully manual
|
||
|
- Audible alarm needed for operator notice when cases are ejected
|
||
|
- Cases conveyors and sealer should stop running and show an alarm to the operator
|
||
|
|
||
|
4. **Ejector Systems:**
|
||
|
- Copack and FS Jar cases conveyors ejectors may need to be movable
|
||
|
- Ejector electrical cabinet needs 24V DC power (not supplied by VMeccanica, only 480V or 110V AC available)
|
||
|
- When ejector sensor is blocked, it should send a signal (specific actions to be determined)
|
||
|
|
||
|
5. **Scrap Management:**
|
||
|
- Scrap on the bottle lines will be managed by Logicscontrol
|
||
|
|
||
|
6. **Coder Integration:**
|
||
|
- Markem-Imaje will provide clean contacts for output management of the following conditions:
|
||
|
- Camera Ready
|
||
|
- Good Read
|
||
|
- Bad Read
|
||
|
- VMeccanica will use only the scrap signal for managing products not correctly read
|
||
|
|
||
|
7. **Mechanical Considerations:**
|
||
|
- Support structures needed for coders, cameras, panel PCs, encoders, and photocells
|
||
|
- Specific mounting instructions and dimensions provided in the documents
|
||
|
|
||
|
8. **Electrical Considerations:**
|
||
|
- Power points needed for coders, Mark&Read panels, and panel PCs
|
||
|
- Detailed power consumption information provided for each device
|
||
|
|
||
|
9. **Encoder and Sensor Details:**
|
||
|
- Encoder model: 10012473 (for 5800), A41372 (for 9750)
|
||
|
- Photocell details: A45640, 6mm diameter fiber tip
|
||
|
|
||
|
Remember to refer to the original documents for detailed schematics and specific measurements for mounting the various components.
|